Quality Inspection for Steam Boiler Electric - SZS Gas Oil PLG Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Innovation, quality and reliability are the core values of our company. These principles today more than ever form the basis of our success as an internationally active mid-size company for steam boiler water treatment, pipe for hot water boiler, Steam Boiler Electric, In a word, when you choose us, you choose a perfect life. Welcome to visit our factory and welcome your order! For further inquiries, please do not hesitate to contact us.
Quality Inspection for Steam Boiler Electric - SZS Gas Oil PLG Boiler – Double Rings Detail:

Introduction :

SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the convection bank tube. The rear part of convection tube bank is a tube-reducing staggered structure,
and the front part is aligned structure. The flue gas generated from furnace combustion flows from furnace rear outlet to the end of combustion chamber, convection tube bank area, amt then turns from the front-left of furnace to the spiral finned tube energy saver, and finally flows into ducting and through chimney emits to atmosphere.

Feature:

1. Due to combustion chamber applying whole membrane water cooling structure.and adopted micro–positive pressure combustion, there is no smoke leakage, and there is no pollution in operation environment;
2. There are explosion door and flame sensor in the boiler arrangement and so operation is safe and reliable;
3. At boiler rear, it adopts the spiral finned tube type energy saver that reduces flue gas emission temperature and therefore raises thermal efficiency. The design efficiency is above 92%;
4.The boiler is horizontal arrangement in compact structure with small floor space area;
5.The manholes are arranged at the two ends of upper and lower drums, and check door is set a rear part of boiler. These openings make users easy for entering inside doing maintenance and cleaning work;
6. The boiler is wholly assembled for delivery, easy for transportation and shortened for installation period;
7.The boiler achieves fully automatic control. It has the functions of automatic running and protection with easy operation.


Product detail pictures:


Related Product Guide:
Boiler Structure

The organization keeps for the procedure concept "scientific administration, superior quality and effectiveness primacy, shopper supreme for Quality Inspection for Steam Boiler Electric - SZS Gas Oil PLG Boiler – Double Rings , The product will supply to all over the world, such as: Costa rica, Tunisia, Boston, We will continue to devote ourselves to market & product development and build a well-knit service to our customer to create a more prosperous future. Please contact us today to find out how we can work together.
The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
5 Stars By Helen from The Swiss - 2018.12.30 10:21
Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
5 Stars By Adam from Ethiopia - 2017.08.18 11:04
Write your message here and send it to us

Related products

  • Diesel Hot Water Boiler Manufacturers - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

    Diesel Hot Water Boiler Manufacturers - Coal B...

    Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

  • Vertical Steam Boiler Suppliers - SZS Fulverized Coal Steam Boiler Hot water boiler – Double Rings

    Vertical Steam Boiler Suppliers - SZS Fulveriz...

    Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

  • Chinese wholesale Industrial Steam Boilers - SZS Gas Oil PLG Boiler – Double Rings

    Chinese wholesale Industrial Steam Boilers - S...

    Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

  • Good User Reputation for Boilers Oil Fired - Boiler Electric Control – Double Rings

    Good User Reputation for Boilers Oil Fired - B...

    More Photos Electric Control Container Overview 2-4T 6T 10T 15T 20T 25T Sheet 1: 2t steam boiler electrical instrument control system configuration (common configuration 1.25Mpa) Features name Specification unit Qty Brand Electrical control           Induced draft fan control 11KW  Star Delta Start  set  1  Zhengtai Blower control  3KW  Direct start  set  1  Grate control  0.55KW  Direct start  set  1  Coal machine control 1.1KW  Direct start  set  1  Slag machine control ...

  • Fast delivery Hot Water Pipe - Biomass Wood Thermal Oil Boiler – Double Rings

    Fast delivery Hot Water Pipe - Biomass Wood Th...

    Thermal Oil Boiler used in Textile,Foods, Rubber ,Paper, Plastic, Wood, Building Materials etc. Feature: 1.Overall structure is reasonable and compact, easy to install. 2.Advanced design, Complete structure 3. Simple water cycle, reasonable structure of pressure parts, guarantee water quality, safe to run 4. Complete Ancillary equipment, advanced comprehensive technology

  • China New Product Electric Heating Boilers - SZS Gas Oil PLG Boiler – Double Rings

    China New Product Electric Heating Boilers - S...

    Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...