Short Lead Time for Biomass Boiler Cost - Pressure Vessel – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

The company upholds the philosophy of "Be No.1 in quality, be rooted on credit and trustworthiness for growth", will continue to serve old and new customers from home and overseas whole-heatedly for good quality water pump, hot oil boilerchina thermal oil boiler, gas fired hot water boiler, We have four leading products. Our products are best sold not only in the Chinese market, but also welcomed in the international market.
Short Lead Time for Biomass Boiler Cost - Pressure Vessel – Double Rings Detail:

Introduction:

Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc.
Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing.
In addition, also equipped with safety devices, meter and safety internals for protection purpose .
Pressure Vessel Main Performance Parameter List
Steam Pressure1.0Mpa
Inlet Temperature 250℃
Saturation Temperature 179℃
Heating Water:Inlet Temperature 90℃;
Outlet Temperature 140℃

Parameter

PW=1.6Mpa Liquified Petroleum Gas Horizontal Tank

Rated Capacity m3

5

10

20

24

30

50

100

Geometric Volume m3

5.03

10.02

21.20

24.31

30.08 50.04 100.23
Max.Filling Capacity  T

2.19

4.37

9.26

10.64

13.12

21.39

43.70

Diameter mm

1200

1600

2000

2000

2200

2600

3000

Length  mm

4670

5270

7100

8270

8310

9820

14720

Equipment Weight  Kg

1890

3410

6100

6800

8700

12300

25100

Pressure Vessel Main Performance Parameter List

Steam Pressure1.0Mpa

Inlet Temperature 250℃

Saturation Temperature 179℃

Heating Water:Inlet Temperature 90℃;

Outlet Temperature 140℃

ModelItem BH400-6-QS BH500-13-QS BH600-20-QS BH800-36-QS BH1000-83-QS
Specification Diameter   mm

400

500

600

800

1000

Area    m2

6

13

20

36

83
Length   m

1.5

2.0

2.0

2.0

2.5

Tube

28

48

72

130

240

Tube side Number

2

2

2

2

2

Heating Water Drum Number

6

6

6

6

6

Flow  T/h

19.6

46.4

71.93

129.36

318.45

Flow Rate m/s

0.27

0.37

0.38

0.38

0.51

Force Loss   Mpa

0.21×10-3

0.44×10-3

0.47×10-3

0.46×10-3

0.91×10-3

Drum(Steam) Flow T/h

2.05

4.86

7.54

13.56

33.38

Heat Transfer performance  Heat transfer m2/

3120

3410

3437

3434

3667

Capacity  MW

1.15

2.72

4.22

7.58

18.63

  Equipment Weight Kg

450

800

1000

2100

3000


Product detail pictures:

Short Lead Time for Biomass Boiler Cost - Pressure Vessel – Double Rings detail pictures

Short Lead Time for Biomass Boiler Cost - Pressure Vessel – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We now have our own gross sales team, style and design workforce, technical crew, QC workforce and package group. We now have strict quality manage procedures for each system. Also, all of our workers are experienced in printing industry for Short Lead Time for Biomass Boiler Cost - Pressure Vessel – Double Rings , The product will supply to all over the world, such as: South Korea, United Arab Emirates, Riyadh, We also provide OEM service that caters to your specific needs and requirements. With a strong team of experienced engineers in hose design and development, we value every opportunity to provide best products and solutions for our customers.
  • Goods just received, we are very satisfied, a very good supplier, hope to make persistent efforts to do better.
    5 Stars By Judy from Bogota - 2018.07.12 12:19
    This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Tina from Tanzania - 2018.09.21 11:01
    Write your message here and send it to us

    Related products

    • factory low price Hot Water Pipe - Coal Boiler Biomass Boiler F.D.Fan – Double Rings

      factory low price Hot Water Pipe - Coal Boiler...

      FD Fan used in Coal Boiler Industrial centrifugal blower fan is used for steam boilers, which has good quality and high efficiency. According to your requirements, we can provide technical solution and technical solution. Below industrial blower fan picture for your reference.

    • Rapid Delivery for Condensing Gas Boilers - Gas oil Boiler Economizer – Double Rings

      Rapid Delivery for Condensing Gas Boilers - Ga...

      More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.

    • China Natural Gas Hot Water Boiler - Gas Oil Thermal Oil Boiler – Double Rings

      China Natural Gas Hot Water Boiler - Gas Oil T...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • China New Product Electric Heating Boilers - Steam&Hot Water Pipe – Double Rings

      China New Product Electric Heating Boilers - S...

      Products Description Structure Steel pipe– insulation layer–steel jacket pipe Steel pipe process 1. Seamless, 2. Spiral steel pipe( SAW) 3. Straight steel pipe(ERW) Insulation layer of external sliding type Fiberglass wool or rock wool Insulation layer of internal sliding type 1. Calcium silicate insulation material 2. Polyurethane insulation material Application 1. Steam 2. Hot oil 3. Hot material Specification DN57-1020mm(1 inch-64 inch) Medium temperature...

    • Factory selling Industrial Electric Boiler - Coal Boiler Economizer – Double Rings

      Factory selling Industrial Electric Boiler - C...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...

    • Wholesale Price Biomass Steam Boiler - Gas Steam Boiler – Double Rings

      Wholesale Price Biomass Steam Boiler - Gas Ste...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...