Short Lead Time for Electric Heating Boilers - SZS Gas Oil PLG Boiler – Double Rings
Short Lead Time for Electric Heating Boilers - SZS Gas Oil PLG Boiler – Double Rings Detail:
Introduction :
SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the convection bank tube. The rear part of convection tube bank is a tube-reducing staggered structure,
and the front part is aligned structure. The flue gas generated from furnace combustion flows from furnace rear outlet to the end of combustion chamber, convection tube bank area, amt then turns from the front-left of furnace to the spiral finned tube energy saver, and finally flows into ducting and through chimney emits to atmosphere.
Feature:
1. Due to combustion chamber applying whole membrane water cooling structure.and adopted micro–positive pressure combustion, there is no smoke leakage, and there is no pollution in operation environment;
2. There are explosion door and flame sensor in the boiler arrangement and so operation is safe and reliable;
3. At boiler rear, it adopts the spiral finned tube type energy saver that reduces flue gas emission temperature and therefore raises thermal efficiency. The design efficiency is above 92%;
4.The boiler is horizontal arrangement in compact structure with small floor space area;
5.The manholes are arranged at the two ends of upper and lower drums, and check door is set a rear part of boiler. These openings make users easy for entering inside doing maintenance and cleaning work;
6. The boiler is wholly assembled for delivery, easy for transportation and shortened for installation period;
7.The boiler achieves fully automatic control. It has the functions of automatic running and protection with easy operation.
Product detail pictures:
Related Product Guide:
Boiler Structure
We goal to see good quality disfigurement within the manufacturing and provide the most effective support to domestic and overseas shoppers wholeheartedly for Short Lead Time for Electric Heating Boilers - SZS Gas Oil PLG Boiler – Double Rings , The product will supply to all over the world, such as: Sri Lanka, Wellington, Danish, We sincerely hope to cooperate with customers all over the world, if you would like to have more information, make sure you kindly contact us, we have been looking forward to building up a great business relationship with you.
By Lauren from Holland - 2018.06.28 19:27
The factory can meet continuously developing economic and market needs, so that their products are widely recognized and trusted, and that's why we chose this company.
By Dolores from Poland - 2017.08.18 18:38