Short Lead Time for Water Tube Boilers - Boiler Installation Material – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We not only will try our greatest to offer you excellent services to just about every client, but also are ready to receive any suggestion offered by our buyers for Outdoor Coal Boiler, pellet biomass boiler, chinese boiler water pump, We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success!
Short Lead Time for Water Tube Boilers - Boiler Installation Material – Double Rings Detail:

Used in Boiler

DZL 6-1.25-AII STEAM BOILER Installation Material List

  Flange Stop Valve

  Item  Description   Quantity
1 DN 150    1.6 MPA 1 PC
2 DN 100    1.6 MPA 1 PC
3 DN 80     1.6 MPA 1 PC
4 DN 65     1.6 MPA 2 PCS
5 DN 50     1.6 MPA 3 PCS
6 DN 40     1.6 MPA 1 PC
7 DN 15     1.6 MPA 1 PC

  Flange Check Valve

  Item  Description   Quantity
1 DN 50     1.6 MPA 1 PC

  Flange

  Item  Description   Quantity
1 DN 150      2 PCS
2 DN 100       30 PCS
3 DN 80      1 PC
4 DN 65       2 PCS
5 DN 50       20 PCS
6 DN 40       8 PCS
7 DN 15       1 PC

  Screw Ball Valve

  Item  Description   Quantity
1 DN 40     1.6 MPA 3 PCS
2 DN 15     1.6 MPA 3 PCS
3 DN 20     1.6 MPA 2 PCS

  Movable Joint (Use in Water Pump)

  Item  Description   Quantity
1 DN 40     2 PCS
2 DN 20       1 PC

 Six-Wing Screw (Double-Head)(Use in Water Pump)

  Item  Description   Quantity
1 DN 40      6 PCS
2 DN 20       4 PCS
3 DN 15 2 PCS

  Pressure Gauge

  Item  Description   Quantity
1 Φ 150  0~1.6Mpa 1 PC
2 Φ 150  0~2.5Mpa 1 PC
3  Pressure Gauge Elbow Pipe 2 PCS
4  Three Way Cock   2 pcs

 Graphite Steel Cushion

  Item  Description   Quantity
1 DN 150   6 PCS
2 DN 100     6 PCS
3 DN 80 10 PCS
4 DN 65       6 PCS
5 DN 50       4 PCS
6 DN 40       10 PCS
7 DN 25       20 PCS
8 DN 20       4 PCS
9 DN 15       4 PCS

  Bolt

  Item  Description  Quantity
1 M 20X65 50 Sets
2 M 18X65 50 Sets
3 M 16X60 240 Sets
4 M 16X50 100 Sets
5 M 12X50 100 Sets
6 M 12X40 200 Sets
7 M 10X40 200 Sets
8 M 20X400 (Stone Bolt use for Chimney) 10 Sets

  Seamless Steal Tube

  Item  Description   Quantity
1  Φ 159 12 meter
2  Φ 108 12 meter
3  Φ 57  30 meter
4  Φ 45 6 meter
5  Φ 76 12 meter
6  Φ 22 12 meter

  Elbow  

  Item  Description  Quantity
1  Φ 159 3 PCS
2  Φ 100 3 PCS
3  Φ 76  2 PCS
4  Φ 57 15 PCS
5  Φ 45 4 PCS
6  Φ 22 2 PCS

 Screw Elbow Use in Pipe of Water Pump

  Item  Description  Quantity
1 DN 40   4 PCS
2 DN 20     2 PCS

 Screw Three-way Use in Pipe of Water Pump

  Item  Description  Quantity
1 DN 40   2 PCS

 Asbestos Rope

 Item  Description  Quantity
1  Asbestos  rope 10 Kg

 


Product detail pictures:

Short Lead Time for Water Tube Boilers - Boiler Installation Material – Double Rings detail pictures

Short Lead Time for Water Tube Boilers - Boiler Installation Material – Double Rings detail pictures

Short Lead Time for Water Tube Boilers - Boiler Installation Material – Double Rings detail pictures

Short Lead Time for Water Tube Boilers - Boiler Installation Material – Double Rings detail pictures


Related Product Guide:
Boiler Structure

It can be our accountability to satisfy your preferences and competently provide you. Your satisfaction is our greatest reward. We are searching ahead towards your visit for joint growth for Short Lead Time for Water Tube Boilers - Boiler Installation Material – Double Rings , The product will supply to all over the world, such as: Boston, America, Burundi, We welcome customers from all over the world come to discuss business. We supply high quality solutions, reasonable prices and good services. We hope to sincerely build business relationships with customers from at home and abroad, jointly striving for a resplendent tomorrow.
  • We always believe that the details decides the company's product quality, in this respect, the company conform our requirements and the goods are meet our expectations.
    5 Stars By Gloria from Germany - 2018.02.04 14:13
    The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
    5 Stars By John biddlestone from Montreal - 2018.10.01 14:14
    Write your message here and send it to us

    Related products

    • Professional Design Thermal Oil Boiler - Boiler Valve and Meter – Double Rings

      Professional Design Thermal Oil Boiler - Boile...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Factory Cheap Hot Steam Boiler For Sale - Well-designed Biomass Pellet Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings – Double Rings

      Factory Cheap Hot Steam Boiler For Sale - Well...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • Factory Free sample Steam Tube - Boiler Electric Control – Double Rings

      Factory Free sample Steam Tube - Boiler Electr...

      More Photos Electric Control Container Overview 2-4T 6T 10T 15T 20T 25T Sheet 1: 2t steam boiler electrical instrument control system configuration (common configuration 1.25Mpa) Features name Specification unit Qty Brand Electrical control           Induced draft fan control 11KW  Star Delta Start  set  1  Zhengtai Blower control  3KW  Direct start  set  1  Grate control  0.55KW  Direct start  set  1  Coal machine control 1.1KW  Direct start  set  1  Slag machine control ...

    • China Boiler Tube Factories - Pressure Vessel – Double Rings

      China Boiler Tube Factories - Pressure Vessel ...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • China Fixed Grate Thermal Oil Boiler - Boiler Flue – Double Rings

      China Fixed Grate Thermal Oil Boiler - Boiler ...

      Used in Boiler Introduction Industrial smoke exhaust, air into the pipe, the pipe is equipped with a damper (valve) to regulate the wind speed and pressure in the pipe. It is composed of furnace wall, partial heating surface pipe and cladding wall pipe to guide the flow of smoke, and through each heating surface for heat exchange, divided into horizontal flue and tail flue. The main smoke duct section size of the large capacity boiler is very large, in order to bear and transfer the loa...

    • Good Wholesale Vendors Biomass Heating - Coal Boiler Biomass Boiler Chimney – Double Rings

      Good Wholesale Vendors Biomass Heating - Coal ...

      Used in Boiler The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect. In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment. A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion. Dispersion of pollutants over a larger area reduces their conc...