Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings
Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings Detail:
Parameter :
DZG(L)Horizontal Type Biomass-Burning Steam Boiler
Main Technology Parameter List
Model | DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S |
DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S |
DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S |
DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S |
DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S |
|||||||
Rated Capacity T/h | 2 | 4 | 6 | 8 | 10 | |||||||
Rated Working Pressure Mpa | 1.0/1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | |||||||
Rated Steam Temp. ℃ | 183/194/204/226 | 194/204/226 | 194/204/226 | 203.04 | 194/204/226 | |||||||
Feed Water Temp. ℃ | 20 | 20 | 20/60 | 20 | 20/60 | |||||||
Fuel Consumption Kg/H | ~310 | ~590 | ~900 | ~1200 | ~1440 | |||||||
Thermal Efficiency % | 78 | 80 | 77.44 | 78 | 80.6 | |||||||
Heating Surface m² | Boiler Body | 33.85 | 75.75 | 142 | 205 | 347 | ||||||
Economizer | 24.64 | 38.5 | 87.2 | 139.52 | ||||||||
Grate area m² | 3.5 | 4.66 | 7.4 | 8.4 | 10.98 | |||||||
Designed Fuel Type | Biomass | Biomass | Biomass | Biomass | Biomass | |||||||
Max.Transport Weight Ton | 21 | 26.5 | 38 | 33 | 28/29 | |||||||
Max. Transport Dimension m | 5.9×2.2×3.3 | 6.5×2.6×3.524 | 7.4×3.2×4.2 | 8.1×3.2×4.2 | 7.6×3.2×3.5 | |||||||
Boiler Auxiliary Equipment Model and Specification | ||||||||||||
Air Blower | Model | T4-72-11;3.2A;Right315° | T4-72-11;4A;Righ 315° | T4-72-11;5A; Right 225° | GG8-Na;7.1A; Right 225° | 10TG811DRight 225° | ||||||
Motor Power | N=3 Kw | N=5.5 Kw | N=11 Kw | N=11 Kw | N=15 Kw | |||||||
Draft Fan | Model | Y9-26;6.3C; Right 0° | Y-9-26;9D; Right 0° | Y-8-39;9D;Right 0° | GY8-1;Na9.5D;Right 0° | 10JY;9.5D; Right 0° | ||||||
Motor Power | N=11 Kw | N=22 Kw | N=30Kw | N=37Kw | N=45 Kw | |||||||
Gear Box | Model | GL-5P | GL-5P | GL-10P | GL-16P | |||||||
Motor Power | N=0.55 Kw | N=0.55 Kw | N=1.1 Kw | N=1.1 Kw | ||||||||
Feed Water Pump | Model | 1½ GC 5×7 | 1½ GC 5×7 | DG 6-25×7 | 2GC-5xT | 1½ GC 6×6 | ||||||
Motor Power | N=7.5 Kw | N=7.5 Kw | N=7.5 Kw | N=22 Kw | N=2.2 Kw | |||||||
Dust Remover | Model | XD-2 | XD-4 | XD-6 | XD-8 | XD-10 |
Fuel: Wood,Rice Husk,shells,Pellets,bagasse,waste etc..
Display
Flow Chat
Product detail pictures:

Related Product Guide:
Boiler Structure
Our concentrate on should be to consolidate and enhance the quality and service of present products, meanwhile consistently produce new products to meet unique customers' demands for Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings , The product will supply to all over the world, such as: Afghanistan, Malta, Hungary, Our mission is "Provide Products with Reliable Quality and Reasonable Prices". We welcome customers from every corner of the world to contact us for future business relationships and achieving mutual success!

With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.

Write your message here and send it to us