Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings
Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings Detail:
Parameter :
DZG(L)Horizontal Type Biomass-Burning Steam Boiler
Main Technology Parameter List
Model | DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S |
DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S |
DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S |
DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S |
DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S |
|||||||
Rated Capacity T/h | 2 | 4 | 6 | 8 | 10 | |||||||
Rated Working Pressure Mpa | 1.0/1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | |||||||
Rated Steam Temp. ℃ | 183/194/204/226 | 194/204/226 | 194/204/226 | 203.04 | 194/204/226 | |||||||
Feed Water Temp. ℃ | 20 | 20 | 20/60 | 20 | 20/60 | |||||||
Fuel Consumption Kg/H | ~310 | ~590 | ~900 | ~1200 | ~1440 | |||||||
Thermal Efficiency % | 78 | 80 | 77.44 | 78 | 80.6 | |||||||
Heating Surface m² | Boiler Body | 33.85 | 75.75 | 142 | 205 | 347 | ||||||
Economizer | 24.64 | 38.5 | 87.2 | 139.52 | ||||||||
Grate area m² | 3.5 | 4.66 | 7.4 | 8.4 | 10.98 | |||||||
Designed Fuel Type | Biomass | Biomass | Biomass | Biomass | Biomass | |||||||
Max.Transport Weight Ton | 21 | 26.5 | 38 | 33 | 28/29 | |||||||
Max. Transport Dimension m | 5.9×2.2×3.3 | 6.5×2.6×3.524 | 7.4×3.2×4.2 | 8.1×3.2×4.2 | 7.6×3.2×3.5 | |||||||
Boiler Auxiliary Equipment Model and Specification | ||||||||||||
Air Blower | Model | T4-72-11;3.2A;Right315° | T4-72-11;4A;Righ 315° | T4-72-11;5A; Right 225° | GG8-Na;7.1A; Right 225° | 10TG811DRight 225° | ||||||
Motor Power | N=3 Kw | N=5.5 Kw | N=11 Kw | N=11 Kw | N=15 Kw | |||||||
Draft Fan | Model | Y9-26;6.3C; Right 0° | Y-9-26;9D; Right 0° | Y-8-39;9D;Right 0° | GY8-1;Na9.5D;Right 0° | 10JY;9.5D; Right 0° | ||||||
Motor Power | N=11 Kw | N=22 Kw | N=30Kw | N=37Kw | N=45 Kw | |||||||
Gear Box | Model | GL-5P | GL-5P | GL-10P | GL-16P | |||||||
Motor Power | N=0.55 Kw | N=0.55 Kw | N=1.1 Kw | N=1.1 Kw | ||||||||
Feed Water Pump | Model | 1½ GC 5×7 | 1½ GC 5×7 | DG 6-25×7 | 2GC-5xT | 1½ GC 6×6 | ||||||
Motor Power | N=7.5 Kw | N=7.5 Kw | N=7.5 Kw | N=22 Kw | N=2.2 Kw | |||||||
Dust Remover | Model | XD-2 | XD-4 | XD-6 | XD-8 | XD-10 |
Fuel: Wood,Rice Husk,shells,Pellets,bagasse,waste etc..
Display
Flow Chat
Product detail pictures:

Related Product Guide:
Boiler Structure
The corporation upholds the philosophy of "Be No.1 in excellent, be rooted on credit rating and trustworthiness for growth", will proceed to provide aged and new buyers from home and abroad whole-heatedly for Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings , The product will supply to all over the world, such as: Senegal, Russia, Brasilia, Our company offers the full range from pre-sales to after-sales service, from product development to audit the use of maintenance, based on strong technical strength, superior product performance, reasonable prices and perfect service, we will continue to develop, to provide the high-quality products and services, and promote lasting cooperation with our customers, common development and create a better future.

After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.

Write your message here and send it to us