Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings
Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings Detail:
Parameter :
DZG(L)Horizontal Type Biomass-Burning Steam Boiler
Main Technology Parameter List
Model | DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S |
DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S |
DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S |
DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S |
DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S |
|||||||
Rated Capacity T/h | 2 | 4 | 6 | 8 | 10 | |||||||
Rated Working Pressure Mpa | 1.0/1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | |||||||
Rated Steam Temp. ℃ | 183/194/204/226 | 194/204/226 | 194/204/226 | 203.04 | 194/204/226 | |||||||
Feed Water Temp. ℃ | 20 | 20 | 20/60 | 20 | 20/60 | |||||||
Fuel Consumption Kg/H | ~310 | ~590 | ~900 | ~1200 | ~1440 | |||||||
Thermal Efficiency % | 78 | 80 | 77.44 | 78 | 80.6 | |||||||
Heating Surface m² | Boiler Body | 33.85 | 75.75 | 142 | 205 | 347 | ||||||
Economizer | 24.64 | 38.5 | 87.2 | 139.52 | ||||||||
Grate area m² | 3.5 | 4.66 | 7.4 | 8.4 | 10.98 | |||||||
Designed Fuel Type | Biomass | Biomass | Biomass | Biomass | Biomass | |||||||
Max.Transport Weight Ton | 21 | 26.5 | 38 | 33 | 28/29 | |||||||
Max. Transport Dimension m | 5.9×2.2×3.3 | 6.5×2.6×3.524 | 7.4×3.2×4.2 | 8.1×3.2×4.2 | 7.6×3.2×3.5 | |||||||
Boiler Auxiliary Equipment Model and Specification | ||||||||||||
Air Blower | Model | T4-72-11;3.2A;Right315° | T4-72-11;4A;Righ 315° | T4-72-11;5A; Right 225° | GG8-Na;7.1A; Right 225° | 10TG811DRight 225° | ||||||
Motor Power | N=3 Kw | N=5.5 Kw | N=11 Kw | N=11 Kw | N=15 Kw | |||||||
Draft Fan | Model | Y9-26;6.3C; Right 0° | Y-9-26;9D; Right 0° | Y-8-39;9D;Right 0° | GY8-1;Na9.5D;Right 0° | 10JY;9.5D; Right 0° | ||||||
Motor Power | N=11 Kw | N=22 Kw | N=30Kw | N=37Kw | N=45 Kw | |||||||
Gear Box | Model | GL-5P | GL-5P | GL-10P | GL-16P | |||||||
Motor Power | N=0.55 Kw | N=0.55 Kw | N=1.1 Kw | N=1.1 Kw | ||||||||
Feed Water Pump | Model | 1½ GC 5×7 | 1½ GC 5×7 | DG 6-25×7 | 2GC-5xT | 1½ GC 6×6 | ||||||
Motor Power | N=7.5 Kw | N=7.5 Kw | N=7.5 Kw | N=22 Kw | N=2.2 Kw | |||||||
Dust Remover | Model | XD-2 | XD-4 | XD-6 | XD-8 | XD-10 |
Fuel: Wood,Rice Husk,shells,Pellets,bagasse,waste etc..
Display
Flow Chat
Product detail pictures:

Related Product Guide:
Boiler Structure
Persisting in "High good quality, Prompt Delivery, Aggressive Price", we've established long-term cooperation with shoppers from each overseas and domestically and get new and previous clients' high comments for Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings , The product will supply to all over the world, such as: Argentina, Eindhoven, Seattle, With the enterprising spirit of" high efficiency, convenience, practicality and innovation", and in line with such serving guidance of "good quality but better price, " and "global credit", we've been striving to cooperate with the automobile parts companies all over the world to make a win-win partnership.

We are old friends, the company's product quality has been always very good and this time the price is also very cheap.

Write your message here and send it to us