Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings
Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings Detail:
Parameter :
DZG(L)Horizontal Type Biomass-Burning Steam Boiler
Main Technology Parameter List
Model | DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S |
DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S |
DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S |
DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S |
DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S |
|||||||
Rated Capacity T/h | 2 | 4 | 6 | 8 | 10 | |||||||
Rated Working Pressure Mpa | 1.0/1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | 1.25/1.57/2.45 | |||||||
Rated Steam Temp. ℃ | 183/194/204/226 | 194/204/226 | 194/204/226 | 203.04 | 194/204/226 | |||||||
Feed Water Temp. ℃ | 20 | 20 | 20/60 | 20 | 20/60 | |||||||
Fuel Consumption Kg/H | ~310 | ~590 | ~900 | ~1200 | ~1440 | |||||||
Thermal Efficiency % | 78 | 80 | 77.44 | 78 | 80.6 | |||||||
Heating Surface m² | Boiler Body | 33.85 | 75.75 | 142 | 205 | 347 | ||||||
Economizer | 24.64 | 38.5 | 87.2 | 139.52 | ||||||||
Grate area m² | 3.5 | 4.66 | 7.4 | 8.4 | 10.98 | |||||||
Designed Fuel Type | Biomass | Biomass | Biomass | Biomass | Biomass | |||||||
Max.Transport Weight Ton | 21 | 26.5 | 38 | 33 | 28/29 | |||||||
Max. Transport Dimension m | 5.9×2.2×3.3 | 6.5×2.6×3.524 | 7.4×3.2×4.2 | 8.1×3.2×4.2 | 7.6×3.2×3.5 | |||||||
Boiler Auxiliary Equipment Model and Specification | ||||||||||||
Air Blower | Model | T4-72-11;3.2A;Right315° | T4-72-11;4A;Righ 315° | T4-72-11;5A; Right 225° | GG8-Na;7.1A; Right 225° | 10TG811DRight 225° | ||||||
Motor Power | N=3 Kw | N=5.5 Kw | N=11 Kw | N=11 Kw | N=15 Kw | |||||||
Draft Fan | Model | Y9-26;6.3C; Right 0° | Y-9-26;9D; Right 0° | Y-8-39;9D;Right 0° | GY8-1;Na9.5D;Right 0° | 10JY;9.5D; Right 0° | ||||||
Motor Power | N=11 Kw | N=22 Kw | N=30Kw | N=37Kw | N=45 Kw | |||||||
Gear Box | Model | GL-5P | GL-5P | GL-10P | GL-16P | |||||||
Motor Power | N=0.55 Kw | N=0.55 Kw | N=1.1 Kw | N=1.1 Kw | ||||||||
Feed Water Pump | Model | 1½ GC 5×7 | 1½ GC 5×7 | DG 6-25×7 | 2GC-5xT | 1½ GC 6×6 | ||||||
Motor Power | N=7.5 Kw | N=7.5 Kw | N=7.5 Kw | N=22 Kw | N=2.2 Kw | |||||||
Dust Remover | Model | XD-2 | XD-4 | XD-6 | XD-8 | XD-10 |
Fuel: Wood,Rice Husk,shells,Pellets,bagasse,waste etc..
Display
Flow Chat
Product detail pictures:

Related Product Guide:
Boiler Structure
Our objective is to present premium quality products at aggressive prices, and top-notch services to buyers around the world. We have been ISO9001, CE, and GS certified and strictly adhere to their excellent specifications for Short Lead Time for Water Tube Boilers - Pellets Shells Husk Biomass Boiler – Double Rings , The product will supply to all over the world, such as: Peru, Honduras, Uruguay, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.

The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!

Write your message here and send it to us