Short Lead Time for Water Tube Boilers - Pressure Vessel – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We attempt for excellence, company the customers", hopes to be the top cooperation team and dominator company for personnel, suppliers and customers, realizes price share and continual marketing for natural gas hot water boiler, china lpg boiler, steam boiler tube, Leading the trend of this field is our persistent goal. Providing first class products is our aim. To create a beautiful future, we would like to cooperate with all friends at home and abroad. Should you have any interest in our products, please do not hesitate to contact us.
Short Lead Time for Water Tube Boilers - Pressure Vessel – Double Rings Detail:

Introduction:

Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc.
Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing.
In addition, also equipped with safety devices, meter and safety internals for protection purpose .
Pressure Vessel Main Performance Parameter List
Steam Pressure1.0Mpa
Inlet Temperature 250℃
Saturation Temperature 179℃
Heating Water:Inlet Temperature 90℃;
Outlet Temperature 140℃

Parameter

PW=1.6Mpa Liquified Petroleum Gas Horizontal Tank

Rated Capacity m3

5

10

20

24

30

50

100

Geometric Volume m3

5.03

10.02

21.20

24.31

30.08 50.04 100.23
Max.Filling Capacity  T

2.19

4.37

9.26

10.64

13.12

21.39

43.70

Diameter mm

1200

1600

2000

2000

2200

2600

3000

Length  mm

4670

5270

7100

8270

8310

9820

14720

Equipment Weight  Kg

1890

3410

6100

6800

8700

12300

25100

Pressure Vessel Main Performance Parameter List

Steam Pressure1.0Mpa

Inlet Temperature 250℃

Saturation Temperature 179℃

Heating Water:Inlet Temperature 90℃;

Outlet Temperature 140℃

ModelItem BH400-6-QS BH500-13-QS BH600-20-QS BH800-36-QS BH1000-83-QS
Specification Diameter   mm

400

500

600

800

1000

Area    m2

6

13

20

36

83
Length   m

1.5

2.0

2.0

2.0

2.5

Tube

28

48

72

130

240

Tube side Number

2

2

2

2

2

Heating Water Drum Number

6

6

6

6

6

Flow  T/h

19.6

46.4

71.93

129.36

318.45

Flow Rate m/s

0.27

0.37

0.38

0.38

0.51

Force Loss   Mpa

0.21×10-3

0.44×10-3

0.47×10-3

0.46×10-3

0.91×10-3

Drum(Steam) Flow T/h

2.05

4.86

7.54

13.56

33.38

Heat Transfer performance  Heat transfer m2/

3120

3410

3437

3434

3667

Capacity  MW

1.15

2.72

4.22

7.58

18.63

  Equipment Weight Kg

450

800

1000

2100

3000


Product detail pictures:

Short Lead Time for Water Tube Boilers - Pressure Vessel – Double Rings detail pictures

Short Lead Time for Water Tube Boilers - Pressure Vessel – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our company since its inception, constantly regards product or service high quality as business life, continually improve creation technology, make improvements to product high-quality and consistently strengthen business total high-quality management, in strict accordance together with the national standard ISO 9001:2000 for Short Lead Time for Water Tube Boilers - Pressure Vessel – Double Rings , The product will supply to all over the world, such as: Muscat, Suriname, Costa rica, Hard work to keep making progress, innovation in the industry, make every effort to first-class enterprise. We try our best to build the scientific management model, to learn abundant professional knowledge, to develop advanced production equipment and production process , to create the first-call quality products, reasonable price , high quality of service , quick delivery , to give you create new value .
  • We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Diana from Albania - 2018.11.04 10:32
    The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Elva from Israel - 2017.12.31 14:53
    Write your message here and send it to us

    Related products

    • Low price for Industrial Boilers Manufacturers - LPG Pressure Tank – Double Rings

      Low price for Industrial Boilers Manufacturers ...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings

      OEM/ODM Supplier Oil Boiler - Installation &am...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • High Performance Package Boiler - LPG Pressure Tank – Double Rings

      High Performance Package Boiler - LPG Pressure...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Renewable Design for Hot Water Boilers - SZS Fulverized Coal Steam Boiler Hot water boiler – Double Rings

      Renewable Design for Hot Water Boilers - SZS F...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • Chinese Professional Gas Steam Boiler - Biomass Wood Thermal Oil Boiler – Double Rings

      Chinese Professional Gas Steam Boiler - Biomas...

      Thermal Oil Boiler used in Textile,Foods, Rubber ,Paper, Plastic, Wood, Building Materials etc. Feature: 1.Overall structure is reasonable and compact, easy to install. 2.Advanced design, Complete structure 3. Simple water cycle, reasonable structure of pressure parts, guarantee water quality, safe to run 4. Complete Ancillary equipment, advanced comprehensive technology

    • Special Price for Hot Oil Boiler - Wood Biomass Boiler – Double Rings

      Special Price for Hot Oil Boiler - Wood Biomas...

      Korean Purchased two sets Biomass Boiler Type: DZL 4-1.25-S  ; SZL 10-1.25-S ; Fuel : Wood Chip, Wood ,Plywood chip etc. Usage : Plywood Factory