DZG(L)Bearing Pressure Hot water boiler
Main Technology Parameter List
Model | DZG0.7-0.7/95/70 DZL0.7-0.7/95/70 |
DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 |
DZL28-1.0/115/70 DZL2.8-1.25/130/70 |
DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 |
||
Rated Capacity T/h | 0.7 | 1.4 | 2.8 | 4.2 | ||
Rated Working Pressure Mpa | 0.7 | 0.7/1.0 | 1.0/1.25 | 1.0/1.25 | ||
Rated Steam Temp. ℃ | 95 | 95/115 | 115/130 | 115/130 | ||
Feed Water Temp. ℃ | 70 | 70 | 70 | 70 | ||
Fuel Consumption Kg/H | ~150 | ~310 | ~590 | ~900 | ||
Thermal Efficiency % | 75 | 78 | 79 | 77.44 | ||
Heating Surface | Boiler Body m² | 32.4 | 33.85 | 75.75 | 142 | |
Economizer m² | 24.64 | 38.5 | 87.2 | |||
Grate area m² | 1.4/2.05 | 2.3/3.5 | 4.66 | 7.4 | ||
Designed Fuel Type | Bituminous Coal | Bituminous Coal | Bituminous Coal | Bituminous Coal | ||
Max. Transport Weight T | ~16 | ~21 | ~26.5 | ~30 | ||
Max. Transport Dimension m | 4.3×2.25×2.955.26×2.25×2.95 | 5.1×2.2×3.35.9×2.2×3.3 | 6.5×2.6×3.5 | 6.01×3.4×3.57.29×2.9×1.7 | ||
Boiler Auxiliary Equipment Model and Specification | ||||||
Air Blower | Model | T4-72-11;3.2A Right | T4-72-11;3.5A Right | T4-72-11;4A Right | T4-72-11;5A Right | |
Motor Power | N=1.5 Kw | N=3 Kw | N=5.5 Kw | N=11 Kw | ||
Draft Fan | Model | YX9-355C ; Right 0° | Y-9-26;6.3C ; Right 0° | Y-9-26;9D;Right 0° | Y8-399D;Ring 0° | |
Motor Power | N=5.5 Kw | N=11 Kw | N=22 Kw | N=30 Kw | ||
Gear Box | Model | GL-5P | GL-5P | GL-5P | GL-10P | |
Motor Power | N=0.55 Kw | N=0.55 Kw | N=0.55 Kw | N=1.1Kw | ||
Feed Water Pump | Model | 1.5WCT-120 | 1.5WCT-120 | 1½ GC5x5 | 2GC5x4 | |
Motor Power | N=2.2 Kw | N=2.2Kw | N=5.5 Kw | N=11 Kw | ||
Dust Remover | Model | XD-1 | XD-2 | XD-4 | XD-6 |
ModelItem | DZL7-1.0/115/70 | DZL14-1.0/115/70 | DZL29-1.25/130/70 | DZL46-1.25/130/70 | DZL58-1.25/130/70 | DZL70-1.25/130/70 | |
Rated Capacity T/h | 7 | 14 | 29 | 46 | 58 | 70 | |
Rated Working Pressure Mpa | 1.0 | 1.0 | 1.25 | 1.25 | 1.25 | 1.25 | |
Rated Steam Temp. ℃ | 115 | 115 | 130 | 130 | 130 | 130 | |
Feed Water Temp. ℃ | 70 | 70 | 70 | 70 | 70 | 70 | |
Heating AreaBoiler Body m² | 228.6 | 434.7 | Radiation:73.07Convection:903.01 | Radiation:147.8Convection:1418.5 | Radiation:147.8Convection:1418.5 | Radiation:147.8Convection:1418.5 | |
Grate area m² | 11.5 | 22.5 | 34.5 | 57.8 | 77 | 91 | |
FuelKj/Kg | Coal | Class II Bituminous Coal | |||||
Low heat | 18757 | 17693 | |||||
Fuel Consumption Kg/h | ~1440 | ~2700 | ~6610 | ~10500 | ~12800 | ~15300 | |
Thermal Efficiency % | 80 | 80 | 82.5 | 82.05 | 83.03 | 83.28 | |
Max. Transport Weight Ton | 35 | 28 | 19.68 | 28.796 | 31 | 31 |
Product detail pictures:
Related Product Guide:
Boiler Structure
Our goal is usually to deliver high quality items at aggressive price ranges, and top-notch service to shoppers around the entire world. We're ISO9001, CE, and GS certified and strictly adhere to their high quality specifications for Special Design for Biomass Boiler Cost - Single Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Zimbabwe, Canada, Ethiopia, We also have the strong ability of integration to supply our best service, and plan to build the warehouse in the different countries around the world, that will probably be more conveniently to service our customers.
By Iris from Guyana - 2018.06.30 17:29
The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
By Clara from United Kingdom - 2017.06.29 18:55
Write your message here and send it to us