Thermal Oil Boiler Factories - Pressure Vessel – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We are also specializing in improving the things management and QC method in order that we could retain terrific edge inside the fiercely-competitive small business for Gas Boiler Hot Water, autoclave tattoo, chinese thermal oil boiler, When you are interested in any of our solutions or want to examine a tailor made get, you should really feel absolutely free to speak to us.
Thermal Oil Boiler Factories - Pressure Vessel – Double Rings Detail:

Introduction:

Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc.
Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing.
In addition, also equipped with safety devices, meter and safety internals for protection purpose .
Pressure Vessel Main Performance Parameter List
Steam Pressure1.0Mpa
Inlet Temperature 250℃
Saturation Temperature 179℃
Heating Water:Inlet Temperature 90℃;
Outlet Temperature 140℃

Parameter

PW=1.6Mpa Liquified Petroleum Gas Horizontal Tank

Rated Capacity m3

5

10

20

24

30

50

100

Geometric Volume m3

5.03

10.02

21.20

24.31

30.08 50.04 100.23
Max.Filling Capacity  T

2.19

4.37

9.26

10.64

13.12

21.39

43.70

Diameter mm

1200

1600

2000

2000

2200

2600

3000

Length  mm

4670

5270

7100

8270

8310

9820

14720

Equipment Weight  Kg

1890

3410

6100

6800

8700

12300

25100

Pressure Vessel Main Performance Parameter List

Steam Pressure1.0Mpa

Inlet Temperature 250℃

Saturation Temperature 179℃

Heating Water:Inlet Temperature 90℃;

Outlet Temperature 140℃

ModelItem BH400-6-QS BH500-13-QS BH600-20-QS BH800-36-QS BH1000-83-QS
Specification Diameter   mm

400

500

600

800

1000

Area    m2

6

13

20

36

83
Length   m

1.5

2.0

2.0

2.0

2.5

Tube

28

48

72

130

240

Tube side Number

2

2

2

2

2

Heating Water Drum Number

6

6

6

6

6

Flow  T/h

19.6

46.4

71.93

129.36

318.45

Flow Rate m/s

0.27

0.37

0.38

0.38

0.51

Force Loss   Mpa

0.21×10-3

0.44×10-3

0.47×10-3

0.46×10-3

0.91×10-3

Drum(Steam) Flow T/h

2.05

4.86

7.54

13.56

33.38

Heat Transfer performance  Heat transfer m2/

3120

3410

3437

3434

3667

Capacity  MW

1.15

2.72

4.22

7.58

18.63

  Equipment Weight Kg

450

800

1000

2100

3000


Product detail pictures:


Related Product Guide:
Boiler Structure

owing to fantastic assistance, a variety of high quality goods, aggressive rates and efficient delivery, we love a very good popularity among our customers. We are an energetic firm with wide market for Thermal Oil Boiler Factories - Pressure Vessel – Double Rings , The product will supply to all over the world, such as: Somalia, Palestine, Southampton, We adopt advanced production equipment and technology, and perfect testing equipment and methods to ensure our product quality. With our high-level talents, scientific management, excellent teams, and attentive service, our merchandise are favored by domestic and foreign customers. With your support, we'll build a better tomorrow!
We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
5 Stars By Cara from Thailand - 2017.09.22 11:32
Problems can be quickly and effectively resolved, it is worth to be trust and working together.
5 Stars By Agnes from Bahamas - 2018.09.19 18:37
Write your message here and send it to us

Related products

  • High Performance Commercial Biomass Boilers - heat recovery boiler – Double Rings

    High Performance Commercial Biomass Boilers - ...

    Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

  • factory low price Hot Water Pipe - heat recovery boiler – Double Rings

    factory low price Hot Water Pipe - heat recove...

    Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

  • Reliable Supplier Boiler Operating - Single Drum Hot Water Boiler – Double Rings

    Reliable Supplier Boiler Operating - Single Dr...

    Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...

  • High Quality for Lpg Boiler - SZS Gas Oil PLG Boiler – Double Rings

    High Quality for Lpg Boiler - SZS Gas Oil PLG ...

    Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

  • High definition Industrial Steam Generator - Oil Steam Boiler – Double Rings

    High definition Industrial Steam Generator - O...

    Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

  • China Wns Steam Boiler - Installation & Technology Service – Double Rings

    China Wns Steam Boiler - Installation & Te...

    Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...