Top Quality Oil Central Heating - Coke Boiler – Double Rings
Top Quality Oil Central Heating - Coke Boiler – Double Rings Detail:
Instruction
DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined with efficient water film dust collector make the ash to meet the requirements of Class A.
The series coking boiler can reach the environmental effects of the gas boiler by burning bituminous coal cost , environmental protection and energy saving.
Parameter :
DZH Coking coil boiler
Main Technology Parameter List
Model | DZH1-0.7-T | DZH2-1.25 | DZH4-1.25-T | DZH6-1.25-T | DZH8-1.25-T | DZH10-1.25-T | ||
Rated Capacity | 1 T/h | 2 T/h | 4 T/h | 6 T/h | 8 T/h | 10 T/h | ||
Rated Working Pressure | 0.7 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | ||
Rated Steam Temp. ℃ | 171 | 194 | 194 | 194 | 194 | 194 | ||
Feed Water Temp. ℃ | 20 | |||||||
Heating Surface | Boiler Body m² | 25.27 | 33.85 | 76 | 142 | 160 | 207 | |
Economizer m² | 17.7 | 35.4 | 59 | 87.2 | 122.08 | 140 | ||
Grate area m² | 1.97 | 2.68 | 3.97 | 6.9 | 7.4 | 9.2 | ||
Design Fule | Metallurgical coke ,foundry coke I II | |||||||
Fuel Consumption Kg/H | ~120 | ~230 | ~475 | ~665 | ||||
Thermal Efficiency % | 76 | 78 | 78 | 78 | 79 | 80 | ||
Max. Transport Weight | ~9 T | ~14.5T | ~21T | ~25T | ~30T | ~20T | ||
Max. Transport Dimension | 3.95×1.9×2.6 | 4.2×2.7×3.0 | 5.8×2.8×3.2 | 6.57×2.75×3.45 | 7.1×3.2×3.5 | 7.6×3.2×3.5 | ||
Finished boiler size m | 3.95×1.9×2.68 | 4.2×2.9×4.2 | 5.8×3.5×4.4 | 6.6x3x3.6 | 7.2x4x4.2 | 7.7×4.1×4.5 | ||
Boiler Auxiliary Equipment Model and Specification | ||||||||
Air Blower | Model | Y6-30-12Left 90° | YX-9-35Left 90° | YX9-35Right 0° | GY6-1Right 0° | 10TYRight 0° | 10TYRight 0° | |
Motor Power | N=4 Kw | N=7.5 Kw | N=18.5 Kw | N=30 Kw | N=45 Kw | N=45 Kw | ||
Draft Fan | Model | T4-72 Right 0° | T4-72 Right 315° | T4-72 Right 315° | GG6-1Right 225° | 10TGRight 225° | 10TGRight 225° | |
Motor Power | N=1.1 Kw | N=2.2 Kw | N=5.5 Kw | N=7.5 Kw | N=14 Kw | N=15 Kw | ||
Feed Water Pump | Model | W vortex | 1½ GC5x7 | 1½ GC5x7 | DG6-25×6 | DG12-25×6 | DG12-25×7 | |
Motor Power | N=3 Kw | N=7.5 Kw | N=7.5 Kw | N=7.5 Kw | N=11 Kw | N=15 Kw | ||
Dust Remover | Water Film Dust Remover |
Product detail pictures:
Related Product Guide:
Boiler Structure
Our corporation insists all along the quality policy of "product top quality is base of organization survival; purchaser pleasure will be the staring point and ending of an company; persistent improvement is eternal pursuit of staff" plus the consistent purpose of "reputation very first, purchaser first" for Top Quality Oil Central Heating - Coke Boiler – Double Rings , The product will supply to all over the world, such as: Finland, Ethiopia, Japan, Our mission is "Provide Goods with Reliable Quality and Reasonable Prices". We welcome customers from every corner of the world to contact us for future business relationships and achieving mutual success!
By Jessie from Hongkong - 2017.10.25 15:53
The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
By Christine from Gabon - 2017.09.16 13:44