As for aggressive costs, we believe that you will be searching far and wide for anything that can beat us. We can state with absolute certainty that for such high-quality at such rates we have been the lowest around for boiler tube for sale, thermal oil boiler for sale, Package Boiler, We welcome new and outdated shoppers from all walks of lifetime to call us for long term company associations and mutual accomplishment!
Wholesale Boiler Tube Manufacturer - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Wholesale Boiler Tube Manufacturer - Installation & Technology Service – Double Rings detail pictures

Wholesale Boiler Tube Manufacturer - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

With advanced technologies and facilities, strict high-quality handle, reasonable rate, superior services and close co-operation with prospects, we are devoted to furnishing the best price for our customers for Wholesale Boiler Tube Manufacturer - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Uganda, Tanzania, Jamaica, Our company follows laws and international practice. We promise to be responsible for friends, customers and all partners. We would like to establish a long-term relationship and friendship with every customer from all over the world on the basis of mutual benefits. We warmly welcome all old and new customers to visit our company to negotiate business.
  • The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Mabel from California - 2017.10.27 12:12
    Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Elsa from Angola - 2017.06.29 18:55
    Write your message here and send it to us

    Related products

    • China Electric Steam Boilers - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      China Electric Steam Boilers - Coal Boiler Bio...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...

    • Discountable price Electricity Boiler - Coal Boiler Biomass Boiler Slag Remover – Double Rings

      Discountable price Electricity Boiler - Coal B...

      Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...

    • Factory wholesale Oil Condensing Boilers - Boiler Ladder and Stair – Double Rings

      Factory wholesale Oil Condensing Boilers - Boi...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Wholesale Discount Coal Boiler - Boiler Water Pump – Double Rings

      Wholesale Discount Coal Boiler - Boiler Water ...

      Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded

    • Reasonable price for Thermal Oil Boiler - Boiler Water Pump – Double Rings

      Reasonable price for Thermal Oil Boiler - Boil...

      Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded

    • Ordinary Discount Boilers Suppliers - Double Drum Steam Boiler – Double Rings

      Ordinary Discount Boilers Suppliers - Double D...

      Coal Steam Boiler-Used in Foods, Textile, Plywood,Paper Brewery,Rice Mill etc.. Introduction : SZL Series assembled water tube boiler adopts longitudinal double drum chain grate boiler. The boiler body is composed of up& down longitudinal drums and convection tube, best heating surface, high thermal efficiency, reasonable design, compact structure, elegant appearance, adequate effect. Two side of Combustion chamber equipped the light pipe water wall tube, up drum equip steam ...