Just about every member from our large efficiency income crew values customers' wants and enterprise communication for electric central heating boiler, rice husk thermal oil boiler, lpg fired hot water boiler, We've been honest and open up. We glance ahead on your pay a visit to and developing trustworthy and long-term standing relationship.
Wholesale Steam Boiler Installation - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Wholesale Steam Boiler Installation - Installation & Technology Service – Double Rings detail pictures

Wholesale Steam Boiler Installation - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We emphasize advancement and introduce new products and solutions into the market each year for Wholesale Steam Boiler Installation - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: San Diego, Lesotho, Grenada, We focus on providing service for our clients as a key element in strengthening our long-term relationships. Our continual availability of high grade products in combination with our excellent pre-sale and after-sales service ensures strong competitiveness in an increasingly globalized market.
  • Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Odelia from Bahamas - 2017.11.11 11:41
    This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
    5 Stars By Faithe from Bahamas - 2017.11.01 17:04
    Write your message here and send it to us

    Related products

    • OEM Customized China Gas Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings

      OEM Customized China Gas Boiler - Coal Boiler ...

      Used in Boiler The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect. In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment. A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion. Dispersion of pollutants over a larger area reduces their conc...

    • New Delivery for Boiler Manufacturing - DHL Corner Tube Bulk Water Pipe Boiler – Double Rings

      New Delivery for Boiler Manufacturing - DHL Co...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • factory customized Outdoor Coal Boiler - Gas Oil Thermal Oil Boiler – Double Rings

      factory customized Outdoor Coal Boiler - Gas O...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • factory Outlets for Steam Boiler Electric - Steam&Hot Water Pipe – Double Rings

      factory Outlets for Steam Boiler Electric - St...

      Products Description Structure Steel pipe– insulation layer–steel jacket pipe Steel pipe process 1. Seamless, 2. Spiral steel pipe( SAW) 3. Straight steel pipe(ERW) Insulation layer of external sliding type Fiberglass wool or rock wool Insulation layer of internal sliding type 1. Calcium silicate insulation material 2. Polyurethane insulation material Application 1. Steam 2. Hot oil 3. Hot material Specification DN57-1020mm(1 inch-64 inch) Medium temperature...

    • China Oil Gas Steam Boiler - Electric Steam Boiler – Double Rings

      China Oil Gas Steam Boiler - Electric Steam Bo...

      Introduction: Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃ Feature Fully automatic operation can be realized by a digital controller switch Control system selected advanced programmable controller, heating element input sequence can be realized the timing automatically switches to extend component life With automatic sewage With automatic wa...

    • Good Wholesale Vendors Lpg Steam Boiler - Wood Biomass Boiler – Double Rings

      Good Wholesale Vendors Lpg Steam Boiler - Wood...

      Korean Purchased two sets Biomass Boiler Type: DZL 4-1.25-S  ; SZL 10-1.25-S ; Fuel : Wood Chip, Wood ,Plywood chip etc. Usage : Plywood Factory