Sticking towards the principle of "Super High-quality, Satisfactory service" ,We've been striving to become a superb business partner of you for Water Boilers, Wood Chip Boiler, Diesel Boiler, Encouraged with the fast producing current market on the speedy foodstuff and beverage consumables all around the entire world , We're hunting forward to functioning with partners/clients to create good results together.
Wholesale Steam Boiler Pressure - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Wholesale Steam Boiler Pressure - Installation & Technology Service – Double Rings detail pictures

Wholesale Steam Boiler Pressure - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We stay with our company spirit of "Quality, Performance, Innovation and Integrity". We goal to create more value for our clients with our abundant resources, advanced machinery, experienced workers and superb solutions for Wholesale Steam Boiler Pressure - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Madrid, Venezuela, Jordan, You can always find the products you need in our company! Welcome to inquire us about our product and anything we know and we can help in auto spare parts. We are looking forward to work with you for a win-win situation.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Alexandra from Thailand - 2018.02.04 14:13
    The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
    5 Stars By Honorio from Istanbul - 2017.11.29 11:09
    Write your message here and send it to us

    Related products

    • Competitive Price for Pressure For Boiler - Coal Boiler Economizer – Double Rings

      Competitive Price for Pressure For Boiler - Co...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...

    • Factory wholesale Oil Condensing Boilers - Coal Boiler Biomass Boiler Slag Remover – Double Rings

      Factory wholesale Oil Condensing Boilers - Coa...

      Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...

    • OEM Customized China Gas Boiler - Coal Boiler Chain Grate – Double Rings

      OEM Customized China Gas Boiler - Coal Boiler ...

      More phtos The patent material  RTSiCr,RQTSi4Mo which is our company’s unique material. High temperature resistance, Special process, longer service life.   Travelling type grate stoker Spare Parts—Grate Bar The structure is simple, the metal consumption is small, the ventilation section ratio is large, and the strength and performance requirements of the driving shaft, the driven shaft and the grate are high.

    • Super Lowest Price Lpg Boiler - Coal Boiler Biomass Boiler I.D.Fan – Double Rings

      Super Lowest Price Lpg Boiler - Coal Boiler Bi...

      I.D fan used in Coal Boiler boiler induced draft fan is designed for the industrial boiler (1-20T / h) or domestic boiler equipped with various coal quality and smoke and dust removal device. It can be selected for the same air inlet conditions and performance, but the high temperature is ≤ 250 ℃. Before induced draft, a dust removal device with efficiency ≤ 85% must be installed to ensure that the dust content of flue gas entering the fan is 400mg/m3

    • Circulating Fluidized Bed Manufacturer - Coal Fired Thermal Oil Boiler – Double Rings

      Circulating Fluidized Bed Manufacturer - Coal ...

      Introduction Thermol Oil boiler uses coal, heavy oil, light oil, combustible gas and other combustible materials as fuel, heat transfer oil as the heat carrier, and uses a circulating oil pump to force a liquid phase to circulate. After the heat energy is transferred to the heating equipment, it is then returned to reheat. Direct current special industrial furnace, heat transfer oil, also known as organic heat carrier or heat medium oil, has been used as an intermediate heat transfer me...

    • Newly Arrival High Efficiency Gas Boiler - Boiler Water Tank – Double Rings

      Newly Arrival High Efficiency Gas Boiler - Boi...

      Used in Boiler Tank accessories (1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top. When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve. Generally, there are not less than 2 floating ball valves. The diameter of the ball float valve is the same as that of the inlet pipe, and each ...