"Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our firm to the long-term to develop together with consumers for mutual reciprocity and mutual advantage for Water Gas Boiler, steam boiler tube, vertical hot oil boiler, If you are interested in any of our products, please feel free to contact us for more details. We hope to cooperate with more friends from all over the world.
Wood Chip Boiler Supplier - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:


Related Product Guide:
Boiler Structure

Our company has been focusing on brand strategy. Customers' satisfaction is our best advertising. We also supply OEM service for Wood Chip Boiler Supplier - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: South Korea, Berlin, Argentina, We strongly believe that technology and service is our base today and quality will create our reliable walls of future. Only we've got better and better quality , could we achieve our customers and ourselves, too. Welcome customers all over the word to contact us for getting further business and reliable relationships. We have been always here working for your demands whenever you require.
We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
5 Stars By Pandora from Paraguay - 2018.12.10 19:03
In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
5 Stars By Roberta from Jamaica - 2018.12.28 15:18
Write your message here and send it to us

Related products

  • Manufacturer for Waste Heat Boiler - Vertical Wood /Coal Boiler – Double Rings

    Manufacturer for Waste Heat Boiler - Vertical ...

    Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...

  • Wholesale Tube Boiler Factories - Coal Boiler Biomass Boiler I.D.Fan – Double Rings

    Wholesale Tube Boiler Factories - Coal Boiler ...

    I.D fan used in Coal Boiler boiler induced draft fan is designed for the industrial boiler (1-20T / h) or domestic boiler equipped with various coal quality and smoke and dust removal device. It can be selected for the same air inlet conditions and performance, but the high temperature is ≤ 250 ℃. Before induced draft, a dust removal device with efficiency ≤ 85% must be installed to ensure that the dust content of flue gas entering the fan is 400mg/m3

  • OEM Customized China Gas Boiler - Biomass Hot Water Boiler – Double Rings

    OEM Customized China Gas Boiler - Biomass Hot ...

    Introduction : Biomass boiler is horizontal three-back water fire pipe composite boiler. The fuel can be Biomass,coal,wood,rice husk,shells,pellets,bagasse,waste etc.. Display Feature: 1. High thermal efficiency 2. By mechanize operation, reduce intensity of labour of stoker. 3. Easy for installation, when on site, only install slag remover, valve, pipe, water and power, etc., the boiler can be launched into running, additionally, the firing is fast. 4. Easy for installation and moving, save...

  • professional factory for Boiler Installation Material – Installation & Technology Service – Double Rings

    professional factory for Boiler Installation Ma...

    Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

  • New Arrival China Hot Water Boiler - Single Drum Steam Boiler – Double Rings

    New Arrival China Hot Water Boiler - Single Dr...

    Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...

  • China Water Gas Boiler Manufacturers - Gas oil Boiler Burner – Double Rings

    China Water Gas Boiler Manufacturers - Gas oil...

    More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...